Sci Fi Base - Developement


Starting Corridor and Control Room

Interior Development


Starting Corridor and Control Room


Starting in the default arena level I started to place panels to form the first basic corridor. These included metal panes arcs, flooring doors but also wiring and lights.


Then the starting arena elements are moved and a large tile is created  as a floor and this had a rough metal material.


Stage 1


Stage 1 and 2 were the college assignment brief to build a set of corridors and a main room.


The first stage was building the walls and floors with panels from Fab.


Stage 2 - Finishing the Main Room and Equipping It


I then searched the Fab market place for lights and items like control panels, equipment, display screens, biomedical experiments and beds. The aim was to make the common centre to be a working room.

This included the hologram display in the centre of the room and cybergenetic experiments and adding sliding doorways to the corridoors to outside.


Stage 3 - Populating the Interior


People, crew, jobs purpose was needed to make the interior alive, stuff going on, that was real and working, so there were added in. From the patient in orange relaced or lying on the best, from the women running the control panels and men doing the same, to the senior person operating the display table and holographic display to the robot dog adding in variety and the doorway to activity going on outside in the market.
 
Often similar animation movies like “Watering the Garden” over the display, “Moving Leavers”, “Playing Cards”, “ Opening Cupboards” all simulate controlling the panels.


Stage 4 - Exiting Via Corridors


Corridors were added and panelled up, and animated sliding doors were added to bridge into the exterior and the temple like archway exist to show this had been a retrofitted older building in an outpost.